RISA Headquarters will be closed Wednesday, November 26-30th for the Thanksgiving Holiday | Normal Business hours will resume on Monday, December 1st.

Elevated Two Way Slab using Dramix 5D Fiber in ADAPT-Builder

10min

In this video, learn how to utilize Dramix 5D Fibers in the analysis and design of a two-way elevated concrete slab in ADAPT-Builder.